How To Install And Connect Solar Panels?

Solar panels can reduce your energy costs and are fairly easy to install, with a little construction and electrical knowledge. Here's how.


Solar panels are a solar power product. They actually collect energy from your solar panels, designed into photovoltaic fabrics that convert the solar power immediately into existing power, often used for heating or energy-efficient appliances. The power is then sent directly to a device or other appliance, or stored internally for long-term use. Panels typically measure about 1.5 feet by 3 feet and can provide about 75 watts if placed in full sun.


Typically, panels are mounted on the roof of a building. However, they are often mounted on freestanding racks, if needed. One of the most important things to consider is how much sun the panels will receive in the area you choose. Solar panels easily lose efficiency even in partially shaded locations, so choose a location that receives as much full sun as possible each day. Panels should be oriented south, if possible. The second most efficient option would be to have panels facing west or east, but you're going to take advantage of the additional panels you purchase to achieve the same energy level. Never install panels facing north.


Be positive and purchase any important permits only before installing panels. Research with your local building or zoning department to determine the needs of your community. If you don't have permits before installation or don't align the installation with local building codes, you may be forced to scrap all your hard work and start over.


Panels should be tilted to achieve optimal sun exposure. The tilt stage depends on the latitude at which they are installed. Panels installed with 0 to 15 degrees of latitude should have a very large tilt of 15 degrees. Panels installed with 15 to 25 degrees of latitude should have a very large tilt, which can be the same with latitude. For every additional 5 degrees of latitude up to 40 degrees, include an additional 5 degrees of tilt for the latitude. At latitudes of 40 degrees and above, include a 20-degree slope for the latitude.


Fasteners should be inserted approximately 48 inches laterally and should be positioned directly on the main rafter, if possible. If rafters are simply not accessible from the mount site, the mount is often connected to some preventative wood inserted around the bottom of this roof. Do not attach mounts directly to the plywood sheathing for this roof. Locate rafters using a stud finder. Maintain a straight line between the mounts using a laser beam sight or perhaps a chalk line.


Drill a pilot hole to ensure you don't separate the rafters. Then secure the base for this roof mount using stainless steel bolts. Place the mount at its base. Create a positive roof flashing for each mount to prevent leaks and into the roof. Attach steel rails to the nearest mounts with stainless steel bolts. A common racking product is connecting aluminum racks to solar steel rails.


Make sure the finished rack product will accommodate solar panels no less than 3 to 6 centimeters above the roof. Panels will perform more efficiently if there is sufficient airflow below and next to them.


Solar panels can likely be assembled in groups. This can make setup less complex and faster, as there are far fewer people to handle around the roof. Protected solar panels for racking products are provided when using hardware to restrain them. Each manufacturer has its own customized hardware, specifically designed for their individual panels. Analyze the panels to ensure they can be securely fastened. Make sure the solar panels are assembled together, and the racking methods are effective and reasonable when used in accordance with community electrical codes.


Connect the solar panels, starting from the junction area of the execution all over again in each panel and attaching the wires to the correct good and bad terminal screws while in the box, it becomes clear from the half-inch of insulation from your trim for this wire first. The wire will work with the participation of the group resulting from the knockout in each box. Run the wire from your last panel to several different box arrays. The wire, then run as a result of the electrical conductor to the nearest electrical aspect of this system, this type, since the cost controll era. at all junction boxes. Your solar panel should actually provide you with several years of satisfying service.

Contact Us

Quick Links

Contact Us

Email : info@sunflower-solar.com 
Tel : +0086-13584366733
WhatsApp : +86 13584366733
Skype : cnsunline
Wechat : deoxudu
Add : No. 18, Xiangyun Road, Wujin Economic Development Zone, Changzhou,Jiangsu, China
 
Copyright © 1ST SUNFLOWER ENERGY Co.,Ltd. All right resolved.